Next steps and stages already completed
What stages are we working on?
Currently we are working on the following stages:
• Minerals and Waste Core Strategy (MWCS) Development Plan Document – Submission draft.
To complete this work we have been doing background studies which will form part of the evidence base. These reports will be published on the website at the same time as the MWCS submission draft.
• Rail site search
• Strategic Flood Risk Assessment (SFRA)
• Sustainability Appraisal (SA) / Strategic Environmental Assessment (SEA)
• Transport Assessments (TAs)
• Waste Capacity Studies
What stages have we already completed?
The latest completed plan stages are:
• Local Development Scheme (MWLDS) 2011
• Annual Monitoring Report (AMR) 2009/10
• Statement of Community Involvement (SCI) : Adopted September 2007
• Preferred Options Waste Development Plan Document (WDPD)
• Preferred Options Minerals Development Plan Document (MDPD)
• Preferred Options Minerals and Waste Core Strategy Development Plan Document (MWCS)
You can read more about these on the documents pages. For more details on past and future consultations please see the consultation page.
Next steps
The 3 main documents which make up the LDF are:
• Minerals and Waste Core Strategy Development Plan Document
• Minerals Development Plan Document
• Waste Development Plan Document
The remaining stages for each of these plans are:
• Submission Minerals and Waste Core Strategy Development Plan Document (MWCS)
Public consultation on published plan
Submission of the plan to Government
Public Examination
• Submission Waste Development Plan Document (WDPD)
Public consultation on published plan
Submission of the plan to Government
Public Examination
• Submission Minerals Development Plan Document (MDPD)
Public consultation on published plan
Submission of the plan to Government
Public Examination
For the timetabled dates for each of these stages, please see the Local Development Scheme.
For more information call 0845 3708090 or email mwldf@buckscc.gov.uk









